Skip to main content
Home
  • About Us
    • Members
    • Leadership
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Trade Ally
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
    • Wildfire
  • Search
Menu

Search form

Spanish Peaks Solar/Spanish Peaks II Solar

August 9, 2024

Spanish Peaks Solar/Spanish Peaks II Solar Construction On Schedule

The Spanish Peaks in Huerfano County, Colo., one of the more prominent geological formations in southern Colorado that have stood the test of time for more than 40 million years, are about to get a new neighbor by the end of the year.

That is when Spanish Peaks Solar and Spanish Peaks II Solar, a combined, 140-megawatt facility, are expected to begin commercial operation to provide electricity to Tri-State Generation and Transmission Association under two power purchase agreements.

The projects, owned by Deriva Energy based in Charlotte, N.C., are concurrently under construction just east of U.S. Interstate 25 north of Trinidad, Colo. Engineering, procurement and management of the project is under the direction of JUWI Inc., and will be built by JUWI’s subsidiary JSI Construction; both have offices in Boulder, Colo. The project is in the service territory of Tri-State member San Isabel Electric Association.

“Our Spanish Peaks project when competed will be another major component to ensure Tri-State’s commitment to provide 70% clean energy used by our members by 2030,” said Matt Zubrod, origination analyst for Tri-State’s Energy Resources department.

Tri-State first signed a power purchase agreement for Spanish Peaks Solar in 2018, but the same factors affecting much of the electric utility industry – including the pandemic, supply chain issues and tariffs on the imports of solar panels and related equipment – delayed the project over the last several years. Spanish Peaks II Solar was later added in 2019 under a separate power purchase agreement.

One of the interesting aspects of the project is that it will provide renewable energy to two different energy markets, when it reaches commercial operation later this year. The 100-megawatt Spanish Peaks Solar will be in the balancing authority serving the Denver metropolitan area and surrounding regions to the north, while the 40-megawatt Spanish Peaks II Solar will be in the balancing authority serving Tri-State members in southern Colorado and New Mexico.

The project began construction on the 1,024-acre site in late 2023 and is about 65% completed; it is expected to employ up to 250-300 workers during the construction phase. Spanish Peaks will use a unique module tracking system developed by JUWI to maximize the potential of generation to the maximum numbers of hours each day. Both projects will have the combined ability to provide electricity to some 38,000 cooperative members.

Spanish Peaks Solar and Spanish Peaks II Solar get their name from the nearby pair of mountains to the west of the project, not surprisingly named Eash Spanish Peak with an elevation of 12,688 feet and West Spanish Peak, with a slightly higher elevation of 13,631 feet. They are higher than any point in the U.S. to the east. Designated as a Natural National Landmark in 1976, the Comanche people referred to the twin peaks as Huajatolla, which also not surprisingly means “double mountain.”

Contributor:

Mark Stutz

Blog Posts

what is beneficial electrification

What is Beneficial Electrification?

Beneficial electrification is a term based in-part on cornerstone research developed by the National Rural Electric Cooperative Association (NRECA) for replacing direct fossil fuel use such as propane, heating oil, and gasoline with electricity.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Tips for Switching to LED Lighting

Tips for Switching to LED Lighting

Thinking of transitioning to LED bulbs? Learn how making the switch to LED light bulbs offers significant energy savings over incandescent and halogen alternatives, and how you can choose the best lighting options for your home
Sander Blackburn, Member Relations Manager
Read more >
Energy Saving Water Heaters

Energy Saving Water Heaters

Conventional water heaters may be a thing of the past with the introduction of a variety of new energy-efficient water heaters. The type of water heater you choose will also affect your water heating costs. Whether you are shopping around for a new energy-saving water heater, looking to replace an old one that just went out, or looking for the best model for a new house build, here are some tips to help you choose carefully.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Make Your Home More Energy Efficient in 2021

How to Make Your Home More Energy Efficient in 2021

Many homeowners are now looking for more ways to make their home energy efficient by stepping into smart home technology, electrified appliances, embracing cleaner energy sources, and pursuing more energy-efficient ways to heat and cool their homes. Here are a few energy-saving tips to make your home more efficient in 2021.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Advantages of heat pumps

Advantages of Heat Pumps for Energy Efficiency

A heat pump is considered one of the most energy-efficient methods for heating and cooling a home, especially compared to homes heated with baseboard electric heat or propane heated homes. With the improvements in technology over the last 5 years, heat pumps are becoming competitive even in homes heated by natural gas.
Peter Rusin, Member Relations Manager
Read more >
Fun Winter Activity Ideas for the Whole Family

Fun Winter Activities for the Whole Family

Snowy, winter days are here, which means outdoor snow activities! Whether you’re heading outdoors for the slopes, trails, ice skating rink, or backyard, remember to practice safety first. Too snowy to go outside? We also have some unique winter activities to enjoy indoors, as well as a few within our members’ footprint throughout Colorado, Nebraska, New Mexico, and Wyoming.
Kristen Wurth, Communications Specialist
Read more >
Holiday Gift Ideas for Electricians

Gift Ideas for the Electrician

If you’re lost for gift ideas for the lineworker or electrician who is also a gadget lover, we've put together a handy list with some of the best tech and electrician gifts of 2020 for those who seem to have it all.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Electrical Safety Tips for the Holidays

Electrical Safety Tips for the Holidays

To keep up the holiday cheer, and to avoid anything that looks like a ‘Griswold’s Christmas’, we’ve outlined a list of very important safety tips to follow to keep you and your family safe. 
Kent Mahanna, MPH, CSP Senior Manager Safety & Security
Read more >
Beneficial Electrification Changing How we Cook

Beneficial Electrification is Changing How We Cook

Beneficial Electrification of your most frequently used home appliances, from the cooktop to heating your home, is a fast-growing movement you’ll want to consider.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >

Pagination

  • First page« First
  • Previous page‹ Previous
  • …
  • Page   3
  • Page   4
  • Page   5
  • Page   6
  • Currently on page   7
  • Page   8
  • Page   9
  • Page   10
  • Page   11
  • Next pageNext ›
  • Last pageLast »

Subscribe

* indicates required
Join our mailing list for
updates and member news.
 
 

Quick links

  • Dark Fiber
  • Wildfire
  • Financials
  • Board Meetings
  • Member Tools
  • The Cooperative Difference
  • Privacy Policy
  • Terms and Conditions
  • Careers
  • Employee login

Tri-State Generation and Transmission Association
Office: 303-452-6111
1100 West 116th Avenue
Westminster, CO 80234

Mailing address:
PO Box 33695
Denver, CO 80233-0695

©2026 Tri-State Generation and Transmission Association, Inc. Power supplier to the rural west.

  • About Us
    • Members
    • Leadership
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Trade Ally
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
    • Wildfire
  • Search