Skip to main content
Home
  • About Us
    • Members
    • Leadership
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Trade Ally
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
    • Wildfire
  • Search
Menu

Search form

Spanish Peaks Solar/Spanish Peaks II Solar

August 9, 2024

Spanish Peaks Solar/Spanish Peaks II Solar Construction On Schedule

The Spanish Peaks in Huerfano County, Colo., one of the more prominent geological formations in southern Colorado that have stood the test of time for more than 40 million years, are about to get a new neighbor by the end of the year.

That is when Spanish Peaks Solar and Spanish Peaks II Solar, a combined, 140-megawatt facility, are expected to begin commercial operation to provide electricity to Tri-State Generation and Transmission Association under two power purchase agreements.

The projects, owned by Deriva Energy based in Charlotte, N.C., are concurrently under construction just east of U.S. Interstate 25 north of Trinidad, Colo. Engineering, procurement and management of the project is under the direction of JUWI Inc., and will be built by JUWI’s subsidiary JSI Construction; both have offices in Boulder, Colo. The project is in the service territory of Tri-State member San Isabel Electric Association.

“Our Spanish Peaks project when competed will be another major component to ensure Tri-State’s commitment to provide 70% clean energy used by our members by 2030,” said Matt Zubrod, origination analyst for Tri-State’s Energy Resources department.

Tri-State first signed a power purchase agreement for Spanish Peaks Solar in 2018, but the same factors affecting much of the electric utility industry – including the pandemic, supply chain issues and tariffs on the imports of solar panels and related equipment – delayed the project over the last several years. Spanish Peaks II Solar was later added in 2019 under a separate power purchase agreement.

One of the interesting aspects of the project is that it will provide renewable energy to two different energy markets, when it reaches commercial operation later this year. The 100-megawatt Spanish Peaks Solar will be in the balancing authority serving the Denver metropolitan area and surrounding regions to the north, while the 40-megawatt Spanish Peaks II Solar will be in the balancing authority serving Tri-State members in southern Colorado and New Mexico.

The project began construction on the 1,024-acre site in late 2023 and is about 65% completed; it is expected to employ up to 250-300 workers during the construction phase. Spanish Peaks will use a unique module tracking system developed by JUWI to maximize the potential of generation to the maximum numbers of hours each day. Both projects will have the combined ability to provide electricity to some 38,000 cooperative members.

Spanish Peaks Solar and Spanish Peaks II Solar get their name from the nearby pair of mountains to the west of the project, not surprisingly named Eash Spanish Peak with an elevation of 12,688 feet and West Spanish Peak, with a slightly higher elevation of 13,631 feet. They are higher than any point in the U.S. to the east. Designated as a Natural National Landmark in 1976, the Comanche people referred to the twin peaks as Huajatolla, which also not surprisingly means “double mountain.”

Contributor:

Mark Stutz

Blog Posts

6 Energy-Saving Tips for Your Home in Summer

6 Energy-Saving Tips to Get Your Home Ready for Summer

Temperatures are on the rise, and summer is predicted to be hotter than average, according to both the National Weather Service and Old Farmer’s Almanac Guide. Here are 6 energy-saving tips you can implement to ensure your home is ready for the heat, without spending a lot of money or energy. 
Myles Jensen, Senior Manager Member Relations
Read more >
Co-op-Powered Broadband Keeps People Connected

Co-op-Powered Broadband Keeps People Connected When it Counts

How electrical co-ops provide essential broadband services to keep communities connected in 2020
Monroe Johnson, Ciello Chief Technology Office
Read more >
Tri-State’s wholesale rates are stable, and forecasted to remain so to 2050

Tri-State’s wholesale rates are stable, and forecasted to remain so to 2050

Our goal with the REP is stable to lower rates. Over the longer term to 2050, with a more low-cost renewables and a focus on cost management, our rates, adjusted for inflation, are forecast to be lower than they are today.
Pat Bridges, Senior Vice President & Chief Financial Officer
Read more >
What is the Benefit of Being a Member of an Electric Co-op?

What is the Benefit of Being a Member of an Electric Co-op?

Today’s consumers increasingly want to buy products and services from purpose-driven organizations that contribute to the greater good. That’s one of the benefits some 42 million Americans receive as members of electric cooperatives.
Jennifer Goss, Senior Vice President, Member Relations
Read more >
10-ways-to-reduce-your-energy-consumption-and-energy-bill

10 Ways to Reduce Your Energy Consumption and Energy Bill

The first steps to reducing your electricity bill are to understand where you're using the most energy, and then look for ways to reduce the amount of energy you use.
Myles Jensen, Senior Manager Member Relations
Read more >

Pagination

  • First page« First
  • Previous page‹ Previous
  • Page   1
  • Page   2
  • Page   3
  • Currently on page   4

Subscribe

* indicates required
Join our mailing list for
updates and member news.
 
 

Quick links

  • Dark Fiber
  • Wildfire
  • Financials
  • Board Meetings
  • Member Tools
  • The Cooperative Difference
  • Privacy Policy
  • Terms and Conditions
  • Careers
  • Employee login

Tri-State Generation and Transmission Association
Office: 303-452-6111
1100 West 116th Avenue
Westminster, CO 80234

Mailing address:
PO Box 33695
Denver, CO 80233-0695

©2026 Tri-State Generation and Transmission Association, Inc. Power supplier to the rural west.

  • About Us
    • Members
    • Leadership
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Trade Ally
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
    • Wildfire
  • Search