Skip to main content
Home
  • About Us
    • Members
    • Leadership
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Trade Ally
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
    • Wildfire
  • Search
Menu

Search form

Spanish Peaks Solar/Spanish Peaks II Solar

August 9, 2024

Spanish Peaks Solar/Spanish Peaks II Solar Construction On Schedule

The Spanish Peaks in Huerfano County, Colo., one of the more prominent geological formations in southern Colorado that have stood the test of time for more than 40 million years, are about to get a new neighbor by the end of the year.

That is when Spanish Peaks Solar and Spanish Peaks II Solar, a combined, 140-megawatt facility, are expected to begin commercial operation to provide electricity to Tri-State Generation and Transmission Association under two power purchase agreements.

The projects, owned by Deriva Energy based in Charlotte, N.C., are concurrently under construction just east of U.S. Interstate 25 north of Trinidad, Colo. Engineering, procurement and management of the project is under the direction of JUWI Inc., and will be built by JUWI’s subsidiary JSI Construction; both have offices in Boulder, Colo. The project is in the service territory of Tri-State member San Isabel Electric Association.

“Our Spanish Peaks project when competed will be another major component to ensure Tri-State’s commitment to provide 70% clean energy used by our members by 2030,” said Matt Zubrod, origination analyst for Tri-State’s Energy Resources department.

Tri-State first signed a power purchase agreement for Spanish Peaks Solar in 2018, but the same factors affecting much of the electric utility industry – including the pandemic, supply chain issues and tariffs on the imports of solar panels and related equipment – delayed the project over the last several years. Spanish Peaks II Solar was later added in 2019 under a separate power purchase agreement.

One of the interesting aspects of the project is that it will provide renewable energy to two different energy markets, when it reaches commercial operation later this year. The 100-megawatt Spanish Peaks Solar will be in the balancing authority serving the Denver metropolitan area and surrounding regions to the north, while the 40-megawatt Spanish Peaks II Solar will be in the balancing authority serving Tri-State members in southern Colorado and New Mexico.

The project began construction on the 1,024-acre site in late 2023 and is about 65% completed; it is expected to employ up to 250-300 workers during the construction phase. Spanish Peaks will use a unique module tracking system developed by JUWI to maximize the potential of generation to the maximum numbers of hours each day. Both projects will have the combined ability to provide electricity to some 38,000 cooperative members.

Spanish Peaks Solar and Spanish Peaks II Solar get their name from the nearby pair of mountains to the west of the project, not surprisingly named Eash Spanish Peak with an elevation of 12,688 feet and West Spanish Peak, with a slightly higher elevation of 13,631 feet. They are higher than any point in the U.S. to the east. Designated as a Natural National Landmark in 1976, the Comanche people referred to the twin peaks as Huajatolla, which also not surprisingly means “double mountain.”

Contributor:

Mark Stutz

Blog Posts

Members of Tri-State direct and support our future Rick Gordon, chair and president

Members of Tri-State direct and support our future Rick Gordon, chair and president

While each utility member has a different perspective, what these letters show is they all agree that Tri-State is on the right path - a path our utility members set themselves
Rick Gordon, Chairman of the Board
Read more >
Cooperatives Bringing Electric Vehicle Chargers to Rural Communities

Cooperatives Bringing Electric Vehicle Chargers to Rural Communities

Bringing public EV chargers to rural areas is not only a service to residents who will drive EVs (including the impressive electric pickup trucks and SUVs coming onto the market soon), but it will also be an economic necessity in the not-too-distant future.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
17 Electrical Safety For Spring Cleaning and Summer Projects

Include Electrical Safety in Your Spring Cleaning and Summer Projects

May is Electrical Safety Month! Here are 17 important electrical safety tips for spring cleaning and summer projects around your yard and home
Kent Mahanna, MPH, CSP Senior Manager Safety & Security
Read more >
Co-op-Powered Broadband Keeps People Connected

Co-op-Powered Broadband Keeps People Connected When it Counts

How electrical co-ops provide essential broadband services to keep communities connected in 2020
Monroe Johnson, Ciello Chief Technology Office
Read more >
How Electricity is Keeping Food Supply Available

How Electricity is Keeping Food Supply Available

Many consumers may not know much about the increasingly critical role this power source plays in getting that food from the farm to your table. And now, as many Americans stock up and social distance, it’s a good time to contemplate the essential role electricity -- and its providers -- play in keeping all of us fed.
Sander Blackburn, Member Relations Manager
Read more >
5 powerful all-electric gardening tools

Take Advantage of These 5 Powerful Electric Gardening Tools

Garden tools powered by electricity can support your green thumb. These electric-powered tools can last longer and are emissions-free, meaning you’ll smell the scents of summer, not the smell of exhaust.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Stay at Home STEM Activity Sites for Kids

18 Stay at Home STEM Activity Sites for Learning and Fun

While we all stay at home and social distance, parents and teachers are searching to find the best resources to bring STEM (Science, Technology, Engineering, and Math) activities to students. Here are 18 websites to check out
Michelle Pastor, Senior Education Program Advisor
Read more >
Tri-State’s wholesale rates are stable, and forecasted to remain so to 2050

Tri-State’s wholesale rates are stable, and forecasted to remain so to 2050

Our goal with the REP is stable to lower rates. Over the longer term to 2050, with a more low-cost renewables and a focus on cost management, our rates, adjusted for inflation, are forecast to be lower than they are today.
Pat Bridges, Senior Vice President & Chief Financial Officer
Read more >
What is the Benefit of Being a Member of an Electric Co-op?

What is the Benefit of Being a Member of an Electric Co-op?

Today’s consumers increasingly want to buy products and services from purpose-driven organizations that contribute to the greater good. That’s one of the benefits some 42 million Americans receive as members of electric cooperatives.
Jennifer Goss, Senior Vice President, Member Relations
Read more >

Pagination

  • First page« First
  • Previous page‹ Previous
  • …
  • Page   3
  • Page   4
  • Page   5
  • Page   6
  • Page   7
  • Page   8
  • Page   9
  • Currently on page   10
  • Page   11
  • Next pageNext ›
  • Last pageLast »

Subscribe

* indicates required
Join our mailing list for
updates and member news.
 
 

Quick links

  • Dark Fiber
  • Wildfire
  • Financials
  • Board Meetings
  • Member Tools
  • The Cooperative Difference
  • Privacy Policy
  • Terms and Conditions
  • Careers
  • Employee login

Tri-State Generation and Transmission Association
Office: 303-452-6111
1100 West 116th Avenue
Westminster, CO 80234

Mailing address:
PO Box 33695
Denver, CO 80233-0695

©2026 Tri-State Generation and Transmission Association, Inc. Power supplier to the rural west.

  • About Us
    • Members
    • Leadership
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Trade Ally
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
    • Wildfire
  • Search