Keeping In Line

Keeping in Line

What it Takes to Build a New Transmission Line

Building a new transmission line isn’t just business as usual for Tri-State. Every project requires great care in unique ways and no project is the same. When our cooperative members have growing loads in their service territories, sometimes building new facilities is the only option to ensure their consumers have safe, reliable energy. The process isn’t an easy one and often takes years of planning, engineering, construction, and restoration. 

Once the need for new transmission facilities is established with the member, one of the first steps is finding the appropriate site for a new substation, if required, and to work with stakeholders to reach a consensus on the preferred route for the transmission line that will carry the new load. Tri-State Lands and Permitting spearheads the transmission line routing process, with input from the project team and stakeholders.

Once the route is established, Lands conducts a market study and determines the fair market value for the properties and Tri-State and the landowners negotiate specifics of the easements. Engineering provides the detailed design including the placement and type of structures to be installed, the length of the spans between structures, and the configuration of the conductors, shield wire and fiber optic cable associated with the transmission line. They also provide the detailed design for the substation facilities and the member interface while adhering to design and safety codes and standards.

The permitting process can take many years depending on a number of factors.  When federal land is involved, the permitting process is significantly more complicated and can take much longer because federal lands are owned collectively by U.S. citizens and all uses must be consistent with the designation of the land and other federal laws, such as the National Environmental Policy Act (NEPA), the Endangered Species Act (ESA), and the National Historic Preservation Act (NHPA), among others. Construction on federal lands may require extensive environmental review, which can take multiple years to complete.

The Environmental team goes to great lengths to determine the most suitable areas for the facilities and the line route, considering costs, constructability, environmental impacts, and community/landowner concerns. From identifying potential routes for the transmission line and associated access roads to conducting required surveys to determine the least impactful project design, no detail is overlooked.   

Constructing a new transmission line takes TLC

How property is treated isn’t something to take lightly. Land is personal and when a landowner agrees to work with us, we take our obligations seriously. While we can’t accommodate all landowner requests, we make every effort to minimize our footprint and ensure their lands remain usable or if they are not, that they are fairly compensated for any losses. We can often work around existing structures on a property, preserve certain landscaping, or span over features such as center-pivot irrigation systems.

In late 2017, Tri-State member High West Energy needed support by adding transmission facilities to help serve their growing load in northeast Colorado. Finished in 2021, the project runs approximately 19 miles across privately owned land just outside of Grover, Colorado. No job is without its challenges and this one came with unique roadblocks and obstacles. 

Transmission Sunset

During the initial stages of the project, biological surveys were conducted that identified burrowing owls and twelve raptor nests within the proposed transmission line alignment. Burrowing owls are a Colorado State Threatened species and raptors and their nests are protected under the Migratory Bird Treaty Act (MBTA). Following Colorado Parks and Wildlife’s seasonal non-encroachment buffers and timing restrictions, impacts to nesting raptors and burrowing owls were avoided. However, pre-construction surveys identified a new Bald Eagle nest within half a mile of the transmission line. 

The environmental team worked with the U.S. Fish and Wildlife Service to implement conservation measures including restricted helicopter use within one mile of the nest, installation of bird flight diverters on the static wire within half a mile of the nest, and continual nest monitoring through construction. Two young eagles successfully fledged the nest in July and no impact to the eagles from the project occurred.  

Another challenge during the project was the removal of an old house on the proposed right-of-way. The site was a homestead of Scottish immigrants and dated back to 1909. However, in recent years the home had been filled with debris and most of the structures had collapsed and degraded. Before the home was removed the environmental team conducted cultural resource surveys, which determined that the site had deteriorated and did not meet the criteria for eligibility on the National Register of Historic Places. Prior to removal, a demolition permit was required from the Colorado Department of Public Health and Environment (CDPHE). The structures were tested for asbestos-containing materials and then safely demolished, and all trash and debris cleared from the site. 

During construction, crews try to minimize the impact on the land and leave the property as close to its original state as possible. After the transmission line is strung and energized, cleanup and restoration of the site begins. This includes removing all waste and debris, re-countering and re-claiming disturbance resulting from construction activities, repairing gates and fences,   and re-seeding of the transmission right-of-way. Restoration is then monitored, sometimes for years, until the vegetation has been restored as close as possible to near pre-construction conditions. 

Construction of the project was accomplished through a collaboration of internal and contracted resources to manage costs and maintain the schedule. The coordination was accomplished through routine meetings led by project management, bringing together members from Transmission, Land Rights and Permitting, Engineering, Construction, Maintenance, Operations, Systems Support, and Supply Chain Services.  

Lineworkers

Transmission investments increase reliability, support renewables and bolster the system

Tri-State’s mission is to serve our members with a reliable, affordable and responsible supply of power in accordance with cooperative principles.  Electricity transmission is an important part of that mission. 

Whether it’s developing new delivery points to provide power to our members, making needed investments in the regional transmission system to keep power reliable while adding more wind and solar resources, or advancing the goal of participating in a regional transmission organization. As our members’ needs change, our job is to make sure we can always deliver the power they need.

 

--

About Tri-State

Tri-State is a power supply cooperative, operating on a not-for-profit basis, serving electric distribution cooperatives and public power district member-owners in four states. Together with our members, we deliver reliable, affordable and responsible power to more than a million electricity consumers across nearly 200,000 square miles of the West. Visit www.tristate.coop.    

 

Contributor:

Brittany Willison

Blog Posts

Electric gardening tools, Warm Weather Tools to Get Your Yard Summer Ready

Warm Weather Tools to Get Your Yard Summer Ready

There’s nothing like relaxing outside and soaking up the fresh air, but sometimes our yards need a little work before we can fully enjoy them. Don’t sweat it, with the help of a few tools you’ll have your yard summer-ready in no time.  
Peter Rusin, Member Relations Manager
Read more >
Energy Saving Maintenance Checklist for Small Businesses

Energy Saving Maintenance Checklist for Small Businesses

Even if you don’t own a small business, you likely know someone who does. They’re the lifeblood of our rural communities, from the neighborhood barber to the downtown coffee shop. Whether you’re the owner or a loyal patron, running a business is a lot of work. Small business owners do it all, and that often includes maintenance that can help reduce energy costs. Our Energy Saving Maintenance Checklist for Small Businesses is a good place to start if you're working on your list of to-dos.
Peter Rusin, Member Relations Manager
Read more >
The Benefits of Heat Pumps in Cold Climates

The Benefits of Heat Pumps in Cold Climates

Many people are still learning about the benefits of heat pumps and what they can do. Heat pumps are especially beneficial in cold weather climates. A heat pump is part of a home heating and cooling system and is installed outside the home. Here are five main types of heat pumps
Peter Rusin, Member Relations Manager
Read more >
Have an Energy Efficient Holiday Season

Have an Energy Efficient Holiday Season

The holiday season can be a lot of fun, but it can also be pretty costly. Between gifts, decorations, and travel expenses, the bills can start to add up quickly. Luckily, there are ways to have a more energy-efficient holiday season that can save you some money. If your to-do list has you stressed, relax and continue reading to learn simple ways to save this year and beyond. 
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
How to Create an Energy-Efficient Laundry Room

How to Create an Energy-Efficient Laundry Room

No matter how big or small, every laundry room has the potential to use less energy. By increasing your laundry room's energy efficiency, you will see a lower bill and might be able to take advantage of rebates through your electric cooperative or public power district. Read on to learn more.
Lonnie Tucker, Relationship Manager
Read more >
Energy Efficiency for Manufactured Homeowners

Energy Efficiency for Manufactured Homeowners

While most new manufactured homes are more energy efficient than their predecessors, the standard energy code that manufactured homes must meet was put in place in 1994. A more efficient standard goes into effect in May 2023 for all new homes manufactured after May 2023. There are many ways to make your manufactured home more energy efficient. The following tips can help you save money on your utility bills and be more comfortable in your home. 
Read more >
Energy Saving Tips While You're Away on Vacation

Energy Saving Tips While You're Away on Vacation

There’s already a lot of prep work that goes into taking a trip. Between planning, finding a pet sitter and catching a flight on time, you don’t need more complications. So, keep it simple with these five easy steps before heading out the door.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
The Future of EVs: Air, Water, and Land

The Future of EVs: Air, Water, and Land

When it comes to the future of electric vehicles, the sky’s the limit – quite literally. In addition to continued innovation in land-based electric vehicles, we are also seeing an increase in interest and investment in air and water-based options. Here’s a look at some of the most exciting developments in each EV category.
Mike Frailey, Relationship Manager 
Read more >
Benefits of Installing an Attic Fan for Summer

Benefits of Installing an Attic Fan for Summer

If you're considering installing an attic fan but aren't sure if it would be a good fit for your house, here are a few points to consider about attic fans, how they function, and how installing one can improve the energy efficiency of your home.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >

Pagination

  • First page« First
  • Previous page‹ Previous
  • Page   1
  • Currently on page   2
  • Page   3
  • Page   4
  • Page   5
  • Page   6
  • Page   7
  • Page   8
  • Page   9
  • …
  • Next pageNext ›
  • Last pageLast »

Subscribe

* indicates required
Join our mailing list for
updates and member news.
 
 

Quick links

  • Leadership Team
  • Dark Fiber
  • Financials
  • Board Meetings
  • Member Tools
  • The Cooperative Difference
  • Privacy Policy
  • Terms and Conditions
  • Careers
  • Employee login

Tri-State Generation and Transmission Association
Office: 303-452-6111
1100 West 116th Avenue
Westminster, CO 80234

Mailing address:
PO Box 33695
Denver, CO 80233-0695

©2025 Tri-State Generation and Transmission Association, Inc. Power supplier to the rural west.

  • About Us
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Quality Install
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
  • Search