Skip to main content
Home
  • About Us
    • Members
    • Leadership
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Trade Ally
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
    • Wildfire
  • Search
Menu

Search form

Spanish Peaks Solar/Spanish Peaks II Solar

August 9, 2024

Spanish Peaks Solar/Spanish Peaks II Solar Construction On Schedule

The Spanish Peaks in Huerfano County, Colo., one of the more prominent geological formations in southern Colorado that have stood the test of time for more than 40 million years, are about to get a new neighbor by the end of the year.

That is when Spanish Peaks Solar and Spanish Peaks II Solar, a combined, 140-megawatt facility, are expected to begin commercial operation to provide electricity to Tri-State Generation and Transmission Association under two power purchase agreements.

The projects, owned by Deriva Energy based in Charlotte, N.C., are concurrently under construction just east of U.S. Interstate 25 north of Trinidad, Colo. Engineering, procurement and management of the project is under the direction of JUWI Inc., and will be built by JUWI’s subsidiary JSI Construction; both have offices in Boulder, Colo. The project is in the service territory of Tri-State member San Isabel Electric Association.

“Our Spanish Peaks project when competed will be another major component to ensure Tri-State’s commitment to provide 70% clean energy used by our members by 2030,” said Matt Zubrod, origination analyst for Tri-State’s Energy Resources department.

Tri-State first signed a power purchase agreement for Spanish Peaks Solar in 2018, but the same factors affecting much of the electric utility industry – including the pandemic, supply chain issues and tariffs on the imports of solar panels and related equipment – delayed the project over the last several years. Spanish Peaks II Solar was later added in 2019 under a separate power purchase agreement.

One of the interesting aspects of the project is that it will provide renewable energy to two different energy markets, when it reaches commercial operation later this year. The 100-megawatt Spanish Peaks Solar will be in the balancing authority serving the Denver metropolitan area and surrounding regions to the north, while the 40-megawatt Spanish Peaks II Solar will be in the balancing authority serving Tri-State members in southern Colorado and New Mexico.

The project began construction on the 1,024-acre site in late 2023 and is about 65% completed; it is expected to employ up to 250-300 workers during the construction phase. Spanish Peaks will use a unique module tracking system developed by JUWI to maximize the potential of generation to the maximum numbers of hours each day. Both projects will have the combined ability to provide electricity to some 38,000 cooperative members.

Spanish Peaks Solar and Spanish Peaks II Solar get their name from the nearby pair of mountains to the west of the project, not surprisingly named Eash Spanish Peak with an elevation of 12,688 feet and West Spanish Peak, with a slightly higher elevation of 13,631 feet. They are higher than any point in the U.S. to the east. Designated as a Natural National Landmark in 1976, the Comanche people referred to the twin peaks as Huajatolla, which also not surprisingly means “double mountain.”

Contributor:

Mark Stutz

Blog Posts

Hero image: orange background with white fire pattern in back. Text says: protecting your home from wildfire

Protecting Your Home Year-Round from Wildfires

Wildfires are no longer seasonal—they're a constant concern. While prevention remains critical, homeowners also have the power to safeguard their properties and communities. This blog explores practical steps anyone can take, from grasping the concept of the wildland-urban interface to creating defensible space and reinforcing homes through hardening and retrofitting. With the right knowledge and action, wildfire mitigation becomes a shared responsibility.
Read more >
Hero image: close up of someone with boots on a trail walking away

Summer Backpacking: Solar Power, Energy Efficiency, and the Best States to Visit

Discover how to make your summer backpacking adventures better with solar-powered gear and energy-efficient planning. Explore seven scenic trails across Colorado, Nebraska, New Mexico, and Wyoming, and learn how to pack light and stay safe. From solar chargers to GPS trackers, this guide helps you harness the sun’s energy while enjoying the great outdoors.
Read more >
Beat the Chill: Effective Insulation Strategies for Winter Comfort

Beat the Chill: Effective Insulation Strategies for Winter Comfort

For those living in older homes, it's common to experience uncomfortable drafts, chilly winters, and higher utility bills compared to newer homes. But here's the good news: improving your home's insulation can help you stay warmer in winter, cooler in summer, and save money in the long run.  Here are some effective insulation strategies for a more comfortable and energy-efficient winter. 
Read more >
Energy Efficient Heating Options for Rural Communities

Energy Efficient Heating Options for Rural Communities in the West

As winter approaches, rural communities in the West face the on-going challenge of keeping their homes warm while managing energy costs. With big temperature swings, it's helpful for families to explore energy-efficient heating options that suit this unique climate. Here’s our favorite tips to get the most out of your current heating system
Peter Rusin, Member Relations Manager
Read more >
How to boost your business with EV charging, attract new clients, increase your sustainability efforts and add a new revenue stream.

Boost Your Business with EV Charging

A lack of EV chargers presents a problem for drivers but an opportunity for local business owners. If you're a business owner, here’s how you can boost your business with EV charging to attract new clients, increase your sustainability efforts and add a new revenue stream.
Mike Frailey, Relationship Manager 
Read more >
Benefits of Having Your Own EV Charger at Home

The Benefits of Having Your Own EV Charger at Home

One of the most recognizable shifts is the adoption of electric vehicles (EVs). As the world embraces EVs, the need for accessible charging infrastructure has grown exponentially. While public charging stations are expanding, there's something uniquely advantageous about having your own EV charger at home. 
Mike Frailey, Relationship Manager 
Read more >
Geothermal Heat Pumps: Harnessing Earth's Energy for Your Business 

Geothermal Heat Pumps: Harnessing Earth's Energy for Your Business 

With April being National Geothermal Month, it’s a perfect time to delve into the process of installing GHPs, their benefits, what climates are the most suitable and how businesses can take advantage of rebates to offset costs while contributing to a greener future. 
Peter Rusin, Member Relations Manager
Read more >
Mastering Energy Efficiency With These Home Upgrades 

Mastering Energy Efficiency with These Home Upgrades 

Power management matters to two kinds of people: those who pay utility bills and environmentally conscious individuals. If you fall into one, or hopefully both, of those categories, here are a few tips for mastering energy efficiency with some home upgrades.  
Peter Rusin, Member Relations Manager
Read more >
Winter Comfort Tips: Transform Your Home into an Energy-Efficient Oasis

Winter Comfort Tips: Transform Your Home into an Energy-Efficient Oasis

There’s nothing better than enjoying creature comforts during the winter chill. Staying warm is a big part of that, but it comes at a price if your home isn't optimized for cold weather. This winter, consider some smart ways to conserve energy, save money, and transform your home into an energy-efficient oasis with these helpful tips
Peter Rusin, Member Relations Manager
Read more >

Pagination

  • Currently on page   1
  • Page   2
  • Page   3
  • Page   4
  • Next pageNext ›
  • Last pageLast »

Subscribe

* indicates required
Join our mailing list for
updates and member news.
 
 

Quick links

  • Dark Fiber
  • Wildfire
  • Financials
  • Board Meetings
  • Member Tools
  • The Cooperative Difference
  • Privacy Policy
  • Terms and Conditions
  • Careers
  • Employee login

Tri-State Generation and Transmission Association
Office: 303-452-6111
1100 West 116th Avenue
Westminster, CO 80234

Mailing address:
PO Box 33695
Denver, CO 80233-0695

©2026 Tri-State Generation and Transmission Association, Inc. Power supplier to the rural west.

  • About Us
    • Members
    • Leadership
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Trade Ally
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
    • Wildfire
  • Search