Skip to main content
Home
  • About Us
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Quality Install
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
  • Search
Menu

Search form

Planning for Reliability

3/7/2024

Q&A With Senior VP Lisa Tiffin

Lisa Tiffin leads the teams that develop Tri-State’s resource plans. In 2023, the teams reached a milestone with Tri-State’s filing of the 2023 Electric Resource Plan. Hear her thoughts on planning and analytics in Tri-State’s 2023 Annual Report. 

What is the Purpose of the Electric Resource Plan (ERP) Tri-State Filed in 2023?

Tri-State is regulated for resource planning on a systemwide basis by the state of Colorado. The overall purpose of this process is reliable resource planning to serve our member needs in the most affordable manner while also meeting our regulatory requirements. Importantly, the resource planning process and the identification of our preferred plan demonstrate how Tri-State is pursuing our energy transition to ensure reliable, affordable and responsible power for our members.

Lisa Tiffin: Planning & Analytics

How Does the Preferred Plan Align with Tri-State’s Goals?

Our ERP’s preferred plan achieves an 80% reduction in greenhouse gas emissions by 2030 as compared to a 2005 baseline in Colorado. Our plan also forecasts that by 2030, 70% of the energy our members use will come from clean resources. We are able to advance our members’ goals while reducing the financial impact of a transitioning grid through the potential New ERA funding as submitted in Tri-State’s Letter of Interest to USDA.

How Do We Factor in Reliability and Resilience as We Look at Adding Renewable Generation and Retiring Coal?

Reliability is the first priority at Tri-State, and that’s built into the way we plan. Tri-State includes standard industry reliability metrics in our planning process. That includes setting a planning reserve margin threshold to limit the loss of load expectation to one day in ten years while minimizing expected unserved energy. However, this is the threshold where Tri-State’s reliability and resilience efforts begin, not end.

Due to the extreme weather events we’re seeing with increasing regularity across our system and the grid, Tri-State along with our member systems established a second threshold for reliability that we call our “Level II Reliability Metrics.” We define periods within the planning horizon and stress related model assumptions (resource output, load, etc.) for those time periods and then measure the reliability of the system under stressed conditions against our Level II metrics.

This is an area we are continuously improving between ERP phases through engagement with stakeholders and industry organization staff as well as through additional studies. It’s our intent to continue to encourage our utility peers, the North American Electric Reliability Corporation (NERC) and others to help us evolve these metrics and see a more grid-wide approach to planning for extreme weather events.

The bottom line is no matter the weather and if our member demand is high, we demonstrate we can keep the lights on, and do it affordably.

Why Are Our Members and Stakeholders So Important to the ERP Process?

Member and stakeholder engagement is critical to an effective ERP process. We’re able to proactively work through issues or concerns with stakeholders through education on Tri-State’s system and the needs of our members. Additionally, Tri-State’s planning processes benefit from the inclusion of insights provided by diverse stakeholder perspectives. Stakeholder engagement in our 2020 ERP was key to building trust to allow us to reach an unopposed comprehensive settlement, and Tri-State continues to take a collaborative approach in our resource planning proceedings.

Our approach is to continuously engage with our members and stakeholders. We conduct multiple public meetings before modeling in each ERP phase and provide additional updates to stakeholders when warranted during the modeling processes. We also engage stakeholder subgroups for topics requiring a deeper dive and ultimately bring any outputs of those discussions back to the full stakeholder group.

What’s Next in the 2023 ERP Process?

The ERP process has two parts. In Phase I, we worked with stakeholders to determine assumptions and scenarios, modeled generic resources and arrived at a preferred plan that represents the most affordable resource mix while respecting reliability metrics and environmental and transmission constraints.

The Phase I proceeding includes discovery, testimony, settlement discussions and, if needed, a hearing which leads to a Colorado Public Utilities Commission decision on the preferred plan along with guidance for Phase II.

In Phase II Tri-State will issue RFPs seeking bids for our resource need as defined in Phase I. Bids are then evaluated through screening processes and modeling. Tri-State will move to acquire resources in our Phase II preferred portfolio once commission approval is received.

 

--

About Tri-State

Tri-State is a power supply cooperative, operating on a not-for-profit basis, serving electric distribution cooperatives and public power district member-owners in four states. Together with our members, we deliver reliable, affordable and responsible power to more than a million electricity consumers across nearly 200,000 square miles of the West. Visit www.tristate.coop.    


View the full 2023 report

Blog Posts

How to Prepare Your Home for a Summer Heat Wave

How to Prepare Your Home for a Summer Heat Wave

During summer heat waves, air conditioning can be a real lifesaver.  Many homes in cooler climate states aren’t always equipped with air conditioning, so when an unexpected heat wave hits, many residents rely on other ways to stay cool without AC. No matter where you live, it’s important to be prepared for hot summer days with efficient cooling and a plan in place to stay comfortable.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
E-Bike Friendly Trails in New Mexico, Colorado, Wyoming, Nebraska

E-Bike Friendly Trails in our Member Service Territories

Electric bikes are quickly becoming the fun, cost-effective and eco-friendly solution to inner-city commuting-and bike trails! Here's some important information to know before venturing out on your e-bike in our member service areas.
Read more >
tips to Save Energy, Money This Summer with Smart Thermostat

Save Energy and Money This Summer with a Smart Thermostat

Thermostats have evolved in the last eleven years, it’s time to take a look at what’s new on the market and there’s no better time than now as we transition into the hot summer months. 
Peter Rusin, Member Relations Manager
Read more >
How to Electrify Your Outdoor Camping Adventures

How to Electrify Your Outdoor Camping Adventures

If you’re heading off the grid for an outdoor adventure this summer you’re likely hoping to unplug and relax in nature. You may not be looking for ways to stay plugged in, but would you consider a few ways to power up your campsite in an easy, convenient way? If the answer is yes, keep reading.
Read more >
Tips for Installing an EV Charging Station at Home

Tips for Installing an EV Charging Station at Home

Electric vehicles (EVs) are the future, there’s no doubt about it. It’s estimated that more than 2.5 million EVs have been sold in the United States and it’s easy to understand why; they cost less to operate, require less maintenance, don’t need gas, they’re better for the environment and they’re fun to drive! If you’ve adopted the EV lifestyle or are considering it, keep reading for tips to help you install your own home charging station.
Read more >
Summer Storm Safety Tips for Camping

Summer Storm Safety Tips for Camping

If you’ve spent some time on the plains or in the mountains across the West, where electric cooperatives serve, you know all about spring and summer storms. Especially noteworthy are the intense storms that begin in March and can last into May. For those who enjoy outdoor activities during this season, it is especially important to be aware of the dangers and take precautions while camping.
Kent Mahanna, MPH, CSP Senior Manager Safety & Security
Read more >
5 Affordable Home Purchases to Help Save Energy

5 Affordable Home Purchases to Help Save Energy

With a handful of simple purchases, you can increase your home’s energy efficiency and cut down your energy bill each month. Here are five practical items and affordable home purchases to help save energy.
Peter Rusin, Member Relations Manager
Read more >
Home Energy Efficient Tips for Spring

8 Home Energy Efficient Tips for Spring

Do you want to make your home more energy-efficient, but don't know where to start? Spring is the perfect time to buckle down on home improvement projects before the summer heatwaves begin. Here are some simple, affordable home improvements to tackle this spring to help you cool off and save energy.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Winter Activities to Explore in New Mexico

Winter Activities to Explore in New Mexico

New Mexico is well-known for its thriving arts community and sunshine-filled outdoor activities. Our member areas offer some of the best history museums and art museums featuring world-famous folk art, sculptures and paintings. There's much to experience outdoors in New Mexico during the winter months, from skiing to national parks, archeological tours and spa getaways. This winter, explore everything New Mexico has to offer with these amazing winter activities in our member areas. 
Kristen Wurth, Communications Specialist
Read more >

Pagination

  • First page« First
  • Previous page‹ Previous
  • Page   1
  • Page   2
  • Currently on page   3
  • Page   4
  • Page   5
  • Page   6
  • Page   7
  • Page   8
  • Page   9
  • …
  • Next pageNext ›
  • Last pageLast »

Subscribe

* indicates required
Join our mailing list for
updates and member news.
 
 

Quick links

  • Leadership Team
  • Dark Fiber
  • Financials
  • Board Meetings
  • Member Tools
  • The Cooperative Difference
  • Privacy Policy
  • Terms and Conditions
  • Careers
  • Employee login

Tri-State Generation and Transmission Association
Office: 303-452-6111
1100 West 116th Avenue
Westminster, CO 80234

Mailing address:
PO Box 33695
Denver, CO 80233-0695

©2025 Tri-State Generation and Transmission Association, Inc. Power supplier to the rural west.

  • About Us
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Quality Install
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
  • Search