Skip to main content
Home
  • About Us
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Quality Install
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
  • Search
Menu

Search form

Planning for Reliability

3/7/2024

Q&A With Senior VP Lisa Tiffin

Lisa Tiffin leads the teams that develop Tri-State’s resource plans. In 2023, the teams reached a milestone with Tri-State’s filing of the 2023 Electric Resource Plan. Hear her thoughts on planning and analytics in Tri-State’s 2023 Annual Report. 

What is the Purpose of the Electric Resource Plan (ERP) Tri-State Filed in 2023?

Tri-State is regulated for resource planning on a systemwide basis by the state of Colorado. The overall purpose of this process is reliable resource planning to serve our member needs in the most affordable manner while also meeting our regulatory requirements. Importantly, the resource planning process and the identification of our preferred plan demonstrate how Tri-State is pursuing our energy transition to ensure reliable, affordable and responsible power for our members.

Lisa Tiffin: Planning & Analytics

How Does the Preferred Plan Align with Tri-State’s Goals?

Our ERP’s preferred plan achieves an 80% reduction in greenhouse gas emissions by 2030 as compared to a 2005 baseline in Colorado. Our plan also forecasts that by 2030, 70% of the energy our members use will come from clean resources. We are able to advance our members’ goals while reducing the financial impact of a transitioning grid through the potential New ERA funding as submitted in Tri-State’s Letter of Interest to USDA.

How Do We Factor in Reliability and Resilience as We Look at Adding Renewable Generation and Retiring Coal?

Reliability is the first priority at Tri-State, and that’s built into the way we plan. Tri-State includes standard industry reliability metrics in our planning process. That includes setting a planning reserve margin threshold to limit the loss of load expectation to one day in ten years while minimizing expected unserved energy. However, this is the threshold where Tri-State’s reliability and resilience efforts begin, not end.

Due to the extreme weather events we’re seeing with increasing regularity across our system and the grid, Tri-State along with our member systems established a second threshold for reliability that we call our “Level II Reliability Metrics.” We define periods within the planning horizon and stress related model assumptions (resource output, load, etc.) for those time periods and then measure the reliability of the system under stressed conditions against our Level II metrics.

This is an area we are continuously improving between ERP phases through engagement with stakeholders and industry organization staff as well as through additional studies. It’s our intent to continue to encourage our utility peers, the North American Electric Reliability Corporation (NERC) and others to help us evolve these metrics and see a more grid-wide approach to planning for extreme weather events.

The bottom line is no matter the weather and if our member demand is high, we demonstrate we can keep the lights on, and do it affordably.

Why Are Our Members and Stakeholders So Important to the ERP Process?

Member and stakeholder engagement is critical to an effective ERP process. We’re able to proactively work through issues or concerns with stakeholders through education on Tri-State’s system and the needs of our members. Additionally, Tri-State’s planning processes benefit from the inclusion of insights provided by diverse stakeholder perspectives. Stakeholder engagement in our 2020 ERP was key to building trust to allow us to reach an unopposed comprehensive settlement, and Tri-State continues to take a collaborative approach in our resource planning proceedings.

Our approach is to continuously engage with our members and stakeholders. We conduct multiple public meetings before modeling in each ERP phase and provide additional updates to stakeholders when warranted during the modeling processes. We also engage stakeholder subgroups for topics requiring a deeper dive and ultimately bring any outputs of those discussions back to the full stakeholder group.

What’s Next in the 2023 ERP Process?

The ERP process has two parts. In Phase I, we worked with stakeholders to determine assumptions and scenarios, modeled generic resources and arrived at a preferred plan that represents the most affordable resource mix while respecting reliability metrics and environmental and transmission constraints.

The Phase I proceeding includes discovery, testimony, settlement discussions and, if needed, a hearing which leads to a Colorado Public Utilities Commission decision on the preferred plan along with guidance for Phase II.

In Phase II Tri-State will issue RFPs seeking bids for our resource need as defined in Phase I. Bids are then evaluated through screening processes and modeling. Tri-State will move to acquire resources in our Phase II preferred portfolio once commission approval is received.

 

--

About Tri-State

Tri-State is a power supply cooperative, operating on a not-for-profit basis, serving electric distribution cooperatives and public power district member-owners in four states. Together with our members, we deliver reliable, affordable and responsible power to more than a million electricity consumers across nearly 200,000 square miles of the West. Visit www.tristate.coop.    


View the full 2023 report

Blog Posts

Fall family activities close to home

5 Fall Family Activities Close to Home

Shorter days don’t mean you’ll be short on opportunities for family fun! Our list of safe fall activities at home will help you embrace the best of the season with your loved ones - all while saving money and staying close to home.
Kent Mahanna, MPH, CSP Senior Manager Safety & Security
Read more >
5 Powerful Electric Tools for Fall Clean-up

5 Powerful Electric Tools for Fall Clean-up

At Tri-State, we are adding renewables and reducing emissions as part of our Responsible Energy Plan. As electricity becomes cleaner, replacing appliances and tools, or even cars and trucks, traditionally powered by fossil fuels,  can further reduce overall emissions. These electric-powered gardening tools can last longer and are emissions-free, meaning you’ll smell the crisp fall air, not the smell of exhaust.
Read more >
how to prepare for bad winter storms

How to Prepare for Winter’s Worst Storms

What should you do for winter storm safety preparation? The safety tips below will help you to prepare for some of the worst winter storm situations. 
Kent Mahanna, MPH, CSP Senior Manager Safety & Security
Read more >
Make Online Math and Science Fun for Kids

10 Ways to Make Online Math and Science Fun

With stay-at-home learning, teachers are facing the challenges of coming up for creative ways to make online learning enjoyable. How to make online math and science fun for kids? Michelle Pastor explores the many ways, and shares her insider knowledge.
Michelle Pastor, Senior Education Program Advisor
Read more >
Power Up Your Child’s Remote Learning

8 Ways to Power Up Your Child’s Remote Learning Routine

In many of our communities, the beginning of the school year is looking more like last spring. As much of our lives stay online, adjusting to remote learning is the new normal. 
Michelle Pastor, Senior Education Program Advisor
Read more >
Create a Productive and Fun Learning Environment for Kids at Home

How to Create a Productive and Fun Learning Environment at Home

Many family homes have now become full or part-time learning spaces as many schools have transitioned to virtual and at-home learning. In order to create a successful learning routine at home for kids, parents should make a plan to create spaces that are organized, calm and productive for learning at home. Here's a few tips to get started.
Michelle Pastor, Senior Education Program Advisor
Read more >
Fun Summer Activities Close to Home

10 Fun Summer Activities Close to Home

Warm weather and long days are a recipe for family fun. No matter the ages or the size of your family, try an activity from our list to enjoy the summer season together - all close to home! 
Michelle Pastor, Senior Education Program Advisor
Read more >
best ways to travel in a van

Van Life: How to Make Your Van More Efficient

Looking to hit the open road and embrace the #VanLife? Here are some efficient ways to travel in a van while exploring America
Kristen Wurth, Communications Specialist
Read more >
ways for kids to conserve energy at school or home

10 Easy Ways for Kids to Conserve Energy at Home and School

As students, parents, and teachers gear up for back to school season, more energy will be used in homes and classrooms. Here are 10 easy ways that kids can be a part of conserving energy in the home and classroom.
Rachel Stout, Communications Intern
Read more >

Pagination

  • First page« First
  • Previous page‹ Previous
  • …
  • Page   3
  • Page   4
  • Page   5
  • Page   6
  • Page   7
  • Currently on page   8
  • Page   9
  • Page   10
  • Page   11
  • Next pageNext ›
  • Last pageLast »

Subscribe

* indicates required
Join our mailing list for
updates and member news.
 
 

Quick links

  • Leadership Team
  • Dark Fiber
  • Financials
  • Board Meetings
  • Member Tools
  • The Cooperative Difference
  • Privacy Policy
  • Terms and Conditions
  • Careers
  • Employee login

Tri-State Generation and Transmission Association
Office: 303-452-6111
1100 West 116th Avenue
Westminster, CO 80234

Mailing address:
PO Box 33695
Denver, CO 80233-0695

©2025 Tri-State Generation and Transmission Association, Inc. Power supplier to the rural west.

  • About Us
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Quality Install
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
  • Search