Skip to main content
Home
  • About Us
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Quality Install
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
  • Search
Menu

Search form

Planning for Reliability

3/7/2024

Q&A With Senior VP Lisa Tiffin

Lisa Tiffin leads the teams that develop Tri-State’s resource plans. In 2023, the teams reached a milestone with Tri-State’s filing of the 2023 Electric Resource Plan. Hear her thoughts on planning and analytics in Tri-State’s 2023 Annual Report. 

What is the Purpose of the Electric Resource Plan (ERP) Tri-State Filed in 2023?

Tri-State is regulated for resource planning on a systemwide basis by the state of Colorado. The overall purpose of this process is reliable resource planning to serve our member needs in the most affordable manner while also meeting our regulatory requirements. Importantly, the resource planning process and the identification of our preferred plan demonstrate how Tri-State is pursuing our energy transition to ensure reliable, affordable and responsible power for our members.

Lisa Tiffin: Planning & Analytics

How Does the Preferred Plan Align with Tri-State’s Goals?

Our ERP’s preferred plan achieves an 80% reduction in greenhouse gas emissions by 2030 as compared to a 2005 baseline in Colorado. Our plan also forecasts that by 2030, 70% of the energy our members use will come from clean resources. We are able to advance our members’ goals while reducing the financial impact of a transitioning grid through the potential New ERA funding as submitted in Tri-State’s Letter of Interest to USDA.

How Do We Factor in Reliability and Resilience as We Look at Adding Renewable Generation and Retiring Coal?

Reliability is the first priority at Tri-State, and that’s built into the way we plan. Tri-State includes standard industry reliability metrics in our planning process. That includes setting a planning reserve margin threshold to limit the loss of load expectation to one day in ten years while minimizing expected unserved energy. However, this is the threshold where Tri-State’s reliability and resilience efforts begin, not end.

Due to the extreme weather events we’re seeing with increasing regularity across our system and the grid, Tri-State along with our member systems established a second threshold for reliability that we call our “Level II Reliability Metrics.” We define periods within the planning horizon and stress related model assumptions (resource output, load, etc.) for those time periods and then measure the reliability of the system under stressed conditions against our Level II metrics.

This is an area we are continuously improving between ERP phases through engagement with stakeholders and industry organization staff as well as through additional studies. It’s our intent to continue to encourage our utility peers, the North American Electric Reliability Corporation (NERC) and others to help us evolve these metrics and see a more grid-wide approach to planning for extreme weather events.

The bottom line is no matter the weather and if our member demand is high, we demonstrate we can keep the lights on, and do it affordably.

Why Are Our Members and Stakeholders So Important to the ERP Process?

Member and stakeholder engagement is critical to an effective ERP process. We’re able to proactively work through issues or concerns with stakeholders through education on Tri-State’s system and the needs of our members. Additionally, Tri-State’s planning processes benefit from the inclusion of insights provided by diverse stakeholder perspectives. Stakeholder engagement in our 2020 ERP was key to building trust to allow us to reach an unopposed comprehensive settlement, and Tri-State continues to take a collaborative approach in our resource planning proceedings.

Our approach is to continuously engage with our members and stakeholders. We conduct multiple public meetings before modeling in each ERP phase and provide additional updates to stakeholders when warranted during the modeling processes. We also engage stakeholder subgroups for topics requiring a deeper dive and ultimately bring any outputs of those discussions back to the full stakeholder group.

What’s Next in the 2023 ERP Process?

The ERP process has two parts. In Phase I, we worked with stakeholders to determine assumptions and scenarios, modeled generic resources and arrived at a preferred plan that represents the most affordable resource mix while respecting reliability metrics and environmental and transmission constraints.

The Phase I proceeding includes discovery, testimony, settlement discussions and, if needed, a hearing which leads to a Colorado Public Utilities Commission decision on the preferred plan along with guidance for Phase II.

In Phase II Tri-State will issue RFPs seeking bids for our resource need as defined in Phase I. Bids are then evaluated through screening processes and modeling. Tri-State will move to acquire resources in our Phase II preferred portfolio once commission approval is received.

 

--

About Tri-State

Tri-State is a power supply cooperative, operating on a not-for-profit basis, serving electric distribution cooperatives and public power district member-owners in four states. Together with our members, we deliver reliable, affordable and responsible power to more than a million electricity consumers across nearly 200,000 square miles of the West. Visit www.tristate.coop.    


View the full 2023 report

Blog Posts

Earth Day 2021 Energy Saving Tips

Earth Day 2021 Energy Saving Tips

Earth Day is coming up Thursday, April 22nd! Launched in 1970, Earth Day 2021 will mark the 51st anniversary of this holiday. This year’s theme is “Restore Our Earth.”
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Home Maintenance Checklist for Spring

Home Maintenance Checklist for Spring

Spring is a big time for cleaning and maintenance. In fact, there’s a reason it’s called “spring cleaning!” With spring finally here, most people are thinking about getting outside and taking advantage of the warmer weather, gardening, clean-up, and home maintenance. 
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Electric Vehicles in 2021

The Surge of Electric Vehicles in 2021

According to Edmunds, 2021 is predicted to be a "pivotal year" for electric vehicles, with U.S. sales rising to 2.5% versus 1.9% last year. With a surge of new models entering the market in the next 11 months, EVs will be hard to ignore.
Mike Frailey, Relationship Manager 
Read more >
Spring Break Road Trip Tips in Your EV

Spring Road Trip Tips in Your EV

Planning a spring road trip in your electric car? Here are the best ways to ensure you have a fun, safe, memorable trip in your EV without range anxiety.
Mike Frailey, Relationship Manager 
Read more >
Electric Vehicles in Colorado: How Tri-State is Helping Members Transition 

Electric Vehicles in Colorado: How Tri-State is Helping Members Transition 

Nearly every state – including all four served by Tri-State and its members – offer incentives for electric vehicles (EVs), and in just the first half of this year alone,  most states have taken additional steps related to EVs. As our states adopt policies to speed up this major change in the transportation sector, Tri-State is taking action to ensure its members are ready.
Mike Frailey, Relationship Manager 
Read more >
Electric Trucks for The Rocky Mountains

Electric Trucks May Be the Future for The Rockies

As electric vehicles (EV) are expanding into the mainstream, so too are the choices for new electric models including electric trucks.  And while there aren’t any on the road right now, several manufacturers expect to be selling these as early as 2021. 
Mike Frailey, Relationship Manager 
Read more >
Induction vs. Gas Cooktops

Induction vs. Gas Cooktops

Are you ready to switch out your gas cooktop? The equipment you use to cook your food is just as important as the ingredients you use. If you are looking to switch out gas for electricity or buy an induction cooktop or range, here are some pros and cons for each, and tips for going with induction. 
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
what is beneficial electrification

What is Beneficial Electrification?

Beneficial electrification is a term based in-part on cornerstone research developed by the National Rural Electric Cooperative Association (NRECA) for replacing direct fossil fuel use such as propane, heating oil, and gasoline with electricity.
Matt Fitzgibbon, Beneficial Electrification Manager
Read more >
Tips for Switching to LED Lighting

Tips for Switching to LED Lighting

Thinking of transitioning to LED bulbs? Learn how making the switch to LED light bulbs offers significant energy savings over incandescent and halogen alternatives, and how you can choose the best lighting options for your home
Sander Blackburn, Member Relations Manager
Read more >

Pagination

  • First page« First
  • Previous page‹ Previous
  • …
  • Page   2
  • Page   3
  • Page   4
  • Page   5
  • Currently on page   6
  • Page   7
  • Page   8
  • Page   9
  • Page   10
  • …
  • Next pageNext ›
  • Last pageLast »

Subscribe

* indicates required
Join our mailing list for
updates and member news.
 
 

Quick links

  • Leadership Team
  • Dark Fiber
  • Financials
  • Board Meetings
  • Member Tools
  • The Cooperative Difference
  • Privacy Policy
  • Terms and Conditions
  • Careers
  • Employee login

Tri-State Generation and Transmission Association
Office: 303-452-6111
1100 West 116th Avenue
Westminster, CO 80234

Mailing address:
PO Box 33695
Denver, CO 80233-0695

©2025 Tri-State Generation and Transmission Association, Inc. Power supplier to the rural west.

  • About Us
    • Annual Report
  • Powering the Future
    • Our Energy Mix
  • Electrify and Save®
    • On-Bill Repayment
    • Programs
    • Quality Install
  • Media
    • Resources
    • Blog
    • Features
    • News
    • Newsletter
    • Podcast
  • Cooperative Benefits
  • Operations
  • Search